Partner project references

See the application
Define your own solution

From an existing data-center retrofit to modular infrastructure, these references put cooling requirements in context.

A clear view of the source.

Reference projects reported in an equipment partner’s project brief. These are partner projects, not projects delivered by COOLMORROW. Our planning notes explain how we would assess a similar enquiry.

Project scale is quoted as reported in the source. Your equipment selection depends on your site conditions and confirmed liquid-side heat load.

01 / EXISTING DATA-CENTER UPGRADE
16liquid-cooled AI servers

Shenzhen, China

Partner reference

From air cooling to liquid-cooled AI

The partner’s project brief describes an air-to-liquid conversion project for a Shenzhen listed company, using cold-plate liquid cooling.

Platform / scope
AI server retrofit
Cooling method
Cold-plate liquid cooling
Source
Partner-supplied project brief, p. 44
Planning a similar project?

What we would clarify with you

Server compatibility, available facility water, the remaining air-cooling load and an installation sequence that fits the permitted downtime.

A useful next deliverable

A retrofit scope with the proposed cooling path, interface checks and a staged installation plan.

Related equipment to discussRack CDUsRack distribution
Discuss a similar project
02 / AI COMPUTE CLUSTER
3 MWreported project scale

Northwest China

Partner reference

Liquid cooling at cluster scale

A partner reference for an AI computing center using H200 liquid-cooled servers and cold-plate cooling.

Platform / scope
H200 liquid-cooled servers
Cooling method
Cold-plate liquid cooling
Source
Partner-supplied project brief, p. 45
Planning a similar project?

What we would clarify with you

Rack loads by phase, facility-water temperatures, distribution pressure losses, maintenance access and redundancy requirements.

A useful next deliverable

A phased equipment configuration, distribution concept and defined operating conditions.

Related equipment to discussFloor-standing CDUsRack distribution
Discuss a similar project
03 / HIGH-DENSITY COMPUTING
500 kWreported project scale

Shenzhen, China

Partner reference

A platform-specific cooling approach

The partner’s project brief lists a GB200 project in Shenzhen with a reported 500 kW project scale and cold-plate liquid cooling.

Platform / scope
GB200
Cooling method
Cold-plate liquid cooling
Source
Partner-supplied project brief, p. 46
Planning a similar project?

What we would clarify with you

The exact compute configuration, server-vendor coolant limits, connector interfaces, control integration and agreed acceptance tests.

A useful next deliverable

A platform-specific selection brief and a list of technical interfaces requiring confirmation.

Related equipment to discussFloor-standing CDUsCooling load banks
Discuss a similar project
04 / MODULAR INFRASTRUCTURE
8 MWreported project scale

Kuwait

Partner reference

Planning beyond the server room

An overseas containerized data-center project reported by the equipment partner, with an 8 MW project scale and cold-plate liquid cooling.

Platform / scope
Containerized data center
Cooling method
Cold-plate liquid cooling
Source
Partner-supplied project brief, p. 42
Planning a similar project?

What we would clarify with you

Site design temperatures, utility availability, external heat rejection, dust exposure, transport dimensions and local installation responsibilities.

A useful next deliverable

A site-dependent module and cooling concept with clear utility and delivery boundaries.

Related equipment to discussModular systemsSkid-mounted CDUs
Discuss a similar project
Your site comes first

References to inform
your site-specific solution

Share your compute platform and facility conditions to begin a project-specific discussion.

Start your project brief